- Barajar
ActivarDesactivar
- Alphabetizar
ActivarDesactivar
- Frente Primero
ActivarDesactivar
- Ambos lados
ActivarDesactivar
- Leer
ActivarDesactivar
Leyendo...
Cómo estudiar sus tarjetas
Teclas de Derecha/Izquierda: Navegar entre tarjetas.tecla derechatecla izquierda
Teclas Arriba/Abajo: Colvea la carta entre frente y dorso.tecla abajotecla arriba
Tecla H: Muestra pista (3er lado).tecla h
Tecla N: Lea el texto en voz.tecla n
Boton play
Boton play
9 Cartas en este set
- Frente
- Atrás
A defect can affect…
|
Several test cases
|
A test case can be affected by…
|
Several defects
|
If you detect a defect, and it exists in the Defect Module in QC, you’ll…
|
Link to existing defect
|
The Test Plan structure is created by…
|
Automatically by sync with Jira
|
The Test Lab structure is created by…
|
QA Support following the QA plan of Project Plan
|
Can you create Defect witout link to a Test Cases defined?
|
Yes, however the compromisse is to create a test case and link with the defect
|
Is it posible to have an execution of a test case in "Passed“ status with an active associated defect?
|
Yes, it can be possible If there are other test cases failed and link to this defect
|
What is the meaning of "Development Activity Id" in the Test Cases
|
It is the code of the project or demand in Clarity for which we are designing the tests
|
Is it posible have the same summary for two User Stories?
|
No. It is possible in Jira, however HP ALM use the summary of the US as id and can’t be repeated
|